Construction Assignment. Please this is only for those who now how to devolop a construction site logistics plan

Assignment No. 2

Each student to develop a site logistics plan

Include adjacent streets

Show building orientation on site

Prepare a project site layout and organizational plan (graphically and narratively)

At a minimum your plan should include:

· A site logistics plan for the mobilization phase of the project (from mobilization

through demolition).

· A site logistics plan for the rough-in phase of the project.

· A site logistics plan for the finishes phase of the project until substantial completion.

At a minimum you should address:

· Jobsite access to and from the worksite; for workers, occupants, public.

· Temporary facilities; utilities, offices, storage, sanitary.

· Materials handling; material movement, delivery, storage, and handling.

· Security, safety, and signage; both inside and outside.

· Communications to owner, occupants, public.

· Work sequence, policies, and procedures

No presentations in class

Since no presentations, provide a written narrative of the work sequence and complete

explanation of the plan. This narrative shall be as if you are presenting this to your client

and explaining what your plan is and defending it.

Any data not identified on the plan but included in your concept shall be defined in the

narrative.

Leave a Comment

Your email address will not be published. Required fields are marked *

Construction Assignment. Please this is only for those who now how to devolop a construction site logistics plan

Assignment No. 2

Each student to develop a site logistics plan

Include adjacent streets

Show building orientation on site

Prepare a project site layout and organizational plan (graphically and narratively)

At a minimum your plan should include:

· A site logistics plan for the mobilization phase of the project (from mobilization

through demolition).

· A site logistics plan for the rough-in phase of the project.

· A site logistics plan for the finishes phase of the project until substantial completion.

At a minimum you should address:

· Jobsite access to and from the worksite; for workers, occupants, public.

· Temporary facilities; utilities, offices, storage, sanitary.

· Materials handling; material movement, delivery, storage, and handling.

· Security, safety, and signage; both inside and outside.

· Communications to owner, occupants, public.

· Work sequence, policies, and procedures

No presentations in class

Since no presentations, provide a written narrative of the work sequence and complete

explanation of the plan. This narrative shall be as if you are presenting this to your client

and explaining what your plan is and defending it.

Any data not identified on the plan but included in your concept shall be defined in the

narrative.

Leave a Comment

Your email address will not be published. Required fields are marked *

Is this question part of your Assignment?

Get expert help

Girl in a jacket


We are a team of academic consultants with extensive experience in writing academic papers for college students in the US, Canada, UK, AU, and other parts of the world.

We help students with both technical and non-technical assignments across all majors & academic disciplines.

Unlike what our name suggests, we research and draft everything word for word. We do not use AI or any rewriting tool! We provide Turnitin reports for AI & Turnitin alongside every paper.

Need help? Send us your assignment now!

description here description here description here